Clark County Water Reclamation District, NV
Home Menu
X
Top Searches:
New Source
“New Source” shall mean:
- Any building, dwelling, structure, facility, or installation from which there is, or may be, a discharge of pollutants, the construction of which commenced after the publication of proposed pretreatment standards pursuant to Section 307(c) of the CWA that will be applicable to such source if such pretreatment standards are thereafter promulgated, in compliance with that Section, provided that:
- The building, structure, facility or installation is constructed at a site at which no other source is located; or
- The building, structure, facility, or installation totally replaces the process or production equipment that causes the discharge of pollutants at an existing source; or
- The production or wastewater generating process of the building, structure, facility, or installation is substantially independent of an existing source at the same site. In determining whether these are substantially independent factors, such as the extent to which the new facility is integrated with the existing plant, and the extent to which the new facility is engaged in the same general type of activity as the existing source, should be considered.
- Construction on a site at which an existing source is located results in a modification rather than a new source if the construction does not create a new building, structure, facility, or installation meeting the criteria of Subsections a. ii and a. iii of this definition, but otherwise alters, replaces, or adds to an existing process or production equipment.
- Construction of a new source as defined under this Subsection has commenced if the customer has begun, or caused to begin, as part of a continuous on-site construction program, any placement, assembly, or installation of facilities or equipment; or significant site preparation work including clearing, excavation, or removal of existing buildings, structures, or facilities which is necessary for the placement, assembly, or installation of new source facilities or equipment; or entered into a binding contractual obligation for the purchase of facilities or equipment which is intended to be used in its operation within a reasonable time. Options to purchase or contracts which can be terminated or modified without substantial loss, and contracts for feasibility, engineering, and design studies do not constitute a contractual obligation under this Subsection.